Page 32 - Impiantistica Industriale
P. 32

ENGINEERING




       Pict .03



































                                                                      the need for any additional equipment. During the
                                                                      lifting a vessel, the tail frame is attached to the ves-
                                                                      sel, which is aligned to the base frame and secured
                                                                      onto the self-propelled modular transporter. The
                                                                      tailing frame is also provided with a movable struc-
                                                                      ture which is tied up to the item to be lifted. When
                                                                      the crawler crane starts lifting the vessel, the SPMT
                                                                      drives forward and the tailing frame movable sec-
                                                                      tion accompany the item during the lifting operation
                                                                      following the angles created during the passage
                                                                      from an horizontal to a vertical position (pict.03).


                                                                      Lifting operations
                                                                      by means of crawler crane


                                                                      Fagioli SPMTs’ took the reactor from its original
       Pict .04
                            The solution to this issue was to lift the reactor by   storing position and moved it toward the lifting
                            a crawler crane, taking it into a vertical position,   area. The tailing frame system was connected to
                            laying the item onto a dedicated skidding system   the SPMTs and to the base of the reactor.  Once
                            in order to move it onto a skid tracks up to its final   checked that the tailing frame structures were cor-
                            foundations.                              rectly installed onto SPMT trolleys (correct position
                            It sounds like a “piece of cake” operation but you’ll   of the support stools, the primary and the secon-
                            see that it was not like that.            dary pivot; the fixing clamps are correctly mounted
                                                                      on the upper and lower parts of the tailing frames),
                                                                      the SPMTs were positioned under the vessel and
                            SPMTs provided                            connected, ready for the first lifting by means of a
                                                                      CC2800 crawler crane. SPMTs were gently lifted in
                            with tailing frame                        order to allow the insertion of the pivot pin and to
                                                                      put the lower support clamps in contact with the
                            Once the vessel was onto its  temporary supports,   reactor skirt (pict.04).
                            Fagioli prepared and assembly a tailor made tailing   Fagioli proceeded with the lifting of the vessel by
                            frame system onto SPMT trailers (pict.02). What is   means of crawler crane and SPMTs, moving gently
                            a tailing frame system? A tailing system provide se-  forward, and helped by the tailing frame.
                            veral advantages when restricted space or ground   During the engineering studies for this project, ano-
                            pressures are an issue and in some situations, they   ther issue was to find the right place for the positio-
                            can create cost-savings for clients by eliminating   ning of a high capacity crawler crane for the lifting


       28  Impiantistica Italiana - Maggio-Giugno 2023