Page 28 - Industrial Plant 2015
P. 28

Fig. 8 - Night overview
on the polyethylene
and polypropylene
polymerization areas

                         reduce the identified HSE risks to a level that is As Low  companies, which made it possible to implement a
                         As Reasonably Practicable (ALARP).                         project of such complexity and indubitable prestige
                                                                                    (figure 8).
                         Conclusions                                                The pillar of all this was the high motivation and
                                                                                    dedication of a group made up not only of professionals
                         Today Borouge 3 plastics are commercially sold in the      but, above all, of people who feel part of the project,
                         world market and we are proud to have been part of         who share the ongoing desire to learn and the capacity
                         the UAE development, thanks to the legacy of resources     to always rise to the challenge. This is the passion that
                         and competences acquired and consolidated by our           united us of the Borouge 3 project team.

                         Marco Crivelli

                         Marco graduated in Environmental Engineering at            Middle East area, where he covered different
                         Politecnico of Milan. Seventeen years of experience in     management roles. He was assigned as Project
                         engineering, construction and management of LSTK           Manager for the Tecnimont-Samsung joint Venture in
                         projects. He spent half of his career abroad, mainly in    Borouge 3 Project.

                         Valeria Bonetti

                         Valeria graduated in Chemical Engineering at Politecnico   Project Manager, taking part of several international
                         of Milan. She has been working for Tecnimont since         EPC LSTK Petrochemical Projects, ether during bidding
                         1996, where, in the first 10 years, she worked for         stage or during execution phase.
                         process and project engineering departments both in        On 2010 she was assigned as Project Manager for the
                         home office and construction site. Afterwards, from        Tecnimont-Samsung joint venture in Borouge 3 Project.
                         2006, she held the positions of Proposal Manager and

               IndustrIal Plants - May 2015

26
   23   24   25   26   27   28   29   30   31   32   33