Figura 10
sollevamento: Site Manager per attività di sollevamenti:
Ing. Martina Bertorelli, per. ind. Gianpiero Mosco Geom. Manuel Capelli (Fagioli SPA).
(Fagioli SPA) con l’ausilio dell’Uffi cio Tecnico Fagioli
SPA (Sant’Ilario d’Enza, RE)
The assembly of the new Ponte San Giorgio
with special lifting means
Fagioli, a leading international company in the sector of exceptional transports and heavy liftings, took part
in every single phase of the reconstruction of the new San Giorgio Bridge in Genoa. The segments made by
Fincantieri were transferred to the construction site by sea and by land thanks to the technologies and means of
the company of Sant’Ilario d’Enza (RE). Here the metal carpentry decks were raised above the piles, with special
lifting means, with activities that took place in parallel, seven days a week, 24 hours a day, to comply with the time
schedule imposed by the Extraordinary Commissioner Marco Bucci.
First, the staff of the Technical Department, then the qualifi ed staff of the Shipyard, conducted demanding
activities, always maintaining high concentration, in conditions of high stress caused by the strong media attention
and, in the last phase, also facing the emergency health related to Covid-19.
This article aims to describe the assembly activities and the installation means used, but also wants to be
a means of thanking all the personnel involved from all the participating companies for the work done with
professionalism and tenacity. It is in this way that it was possible to return this important and strategic colossal
infrastructure the city of Genoa and to the country in a very short time.