Amec Foster Wheeler (now Wood).          Heater ∏2 was unchanged, but the symmetrical
                                  To increase radiant tubes fluid mass velocity at a   piping system adopted to control the fluid distribu-
                                  more appropriate value, the radiant process tubes   tion to heater passes was upgraded with dedicated
                                  and supports of heaters  ∏1 and ∏3 were totally   control valves for each pass. Such pass-dedicated
                                  replaced with smaller diameter, in such a way that   control valves replaced the existing total flow con-
                                  no other modifications were required, except for   trol valve.
                                  refractory touch-up.                     The  three dewaxing  heaters  ∏1/∏2/∏3  modified
                                  Convection section of heaters ∏1 and ∏3 was   in accordance with the recommendations of the
                                  modified. The last two tube rows of heater ∏1 con-  process study were put back in operation and a
                                  vection section were replaced with smaller tubes   dedicated test run confirmed the adequacy of the
                                  designed with extended surface. The existing feed   implemented solutions. The smooth operation in
                                  pumps and control valves were checked.   the new conditions pleased the customer to the full
                                  The last three convection tube rows of heater ∏3   satisfaction of Kirishinefteorgsyntez.
                                  were replaced with new smaller tubes designed
                                  with  extended  surface.  The  existing  feed  pumps   A special thanks to Emiliano Cogliati for his valuable
                                  and control valve were also verified.    contribution to the article





                                  Mauro Bertolini



                                  Mauro is a graduated Chemical Engineer with over   chemical plants.
                                  20 years’ experience as Thermal Design Manager   He has executed diverse projects worldwide rang-
                                  in in Fired Heaters group of Amec Foster Wheeler   ing from refineries and chemical projects and his
                                  (now Wood). Experiences include process design,   experience includes activities at site for survey,
                                  process  follow-up  during  engineering  execution,   commissioning  and  start-up,  test  run  of  projects
                                  proposal preparation and management of all types   executed in Europe, Russia and former CIS coun-
                                  of fired heaters in oil refining, petrochemical and   tries, America, Asia and Middle East.




                                  Daniele Brambilla



                                  Daniele is a graduated Chemical Engineer, with   refinery and petrochemical sectors.
                                  over 12 years’ experience as Principal Thermal De-  Daniele has executed diverse projects worldwide,
                                  sign Engineer in Fired Heaters group of Amec Fos-  ranging from refineries and chemical projects, in
                                  ter Wheeler (now Wood). Experiences range from   Asia (Russia, Kazakhstan, Thailand, Malaysia), Mid-
                                  process design to detail engineering of all types of   dle East (UAE, KSA) and Europe (Belarus, Ukraine,
                                  fired heaters and waste heat recovery boilers, in oil   Albania).




                            Trouble shooting e revamp di tre forni nell’unità di dewaxing
                            della raffineria di Kirishi in Russia


                            Uno studio termodinamico e fluidodinamico per individuare le cause dei
                            problemi a tre forni recentemente installati

                            La raffineria di Kirishi ha richiesto supporto al gruppo Fired Heaters della Amec Foster Wheeler (ora Wood).
                            Lo studio ha incluso una visita in campo finalizzata a effettuare la verifica dei forni per individuare possibili
                            soluzioni ai problemi riscontrati in campo su tre forni recentemente installati. Lo studio ha incluso la verifica
                            termodinamica e fluidodinamica dei forni di dewaxing ∏-1, ∏ -2 e ∏ -3 per individuare l’origine dei gravi
                            problemi meccanici occorsi ai tubi e potenzialmente in grado di minare l’integrità meccanica delle parti a
                            pressione. Lo studio basato sulla verifica dei parametri operativi del forno e su una simulazione del moto di
                            flusso ha determinato le cause principali dei problemi.
                            Sono state proposte e implementate delle modifiche per ovviare alle problematiche riscontrate e poter operare i
                                                                                                                61
                                                                                    Impiantistica Italiana - Marzo - Aprile 2018
                            forni in modo sicuro ed efficiente.